Class IA, IB, and IC CAFOs in the state of Missouri must complete neighbor
notification requirements prior to filing a construction permit. The following
information must be compiled: | ||||||||||||||||||||||||||||||||
| 1. | The number of animals designed for the operation. |
| 2. | The waste handling plan and general layout of the operation. |
| 3. | The location and number of acres of the operation. |
| 4. | Name, address, and telephone number of registered agent. |
| 5. | Notice that MDNR will accept written comments for a 30-day period. The 30-day period will begin on the day the construction permit application is received by MDNR. |
| 6. | The schedule date that the operation intends to submit a construction permit to MDNR. |
| 7. | MDNR's address for receiving comments. |
| 1. | MDNR's Water Pollution Control Program; | ||||||||||||
| 2. | The county governing body; and | ||||||||||||
| 3. | All adjoining owners of property located within one and one-half times the
buffer distances required for facilities.
Distances are to be measured from the nearest animal confinement building or waste holding basin to the adjoining property line. | ||||||||||||